Summerhill Avenue Road Resurfacing: August 7 to 25, 2017

summerhill_construction_notice.png

WORK DETAILS

The City’s contractor will:

  • Dig up the road surface
  • Re-align maintenance holes and catch basins
  • Repair curbs, gutters and driveways
  • Repave the road surface

 

WHAT TO EXPECT DURING CONSTRUCTION

  • You may experience dust, noise and other inconveniences. The City will make efforts to reduce the impacts. We appreciate your patience. 
  • Property owners should remove items located within City property limits (boulevard), such as landscaping and/or decorative objects. If you have a sprinkler system within the boulevard, please contact the Field Ambassador. 
  • The City will not be responsible for damage to any privately owned items on City property.
Work Hours: Work will take place Monday to Friday from 7:00 am to 7:00 pm.Saturday from 9:00 am to 5:00 pm with work after hours and on Sunday as approved by the City.    

Road and Sidewalk Access: In order to complete the work in a safe manner, there will be road and sidewalk restrictions within the construction work zone. Access for emergency vehicles will be maintained at all times.

Driveway Access: The contractor will notify you of any temporary restrictions to your driveway access. If your property has two entrances, one entrance will be kept open at all times.

Traffic Management: Efforts have been made to manage traffic in the area for the safety of workers, road users and residents. Road users should expect delays and increased traffic on nearby streets.Traffic on will be reduced on streets with active construction / access may be limited when paving operations are taking place.
Parking: Parking in the active work zone is not permitted due to space requirements for construction equipment and materials. A separate parking notice identifying alternative parking will be issued.
Garbage & Recycling: Please follow your normal routine. If required, the contractor will move bins to an appropriate location and return them.  Please ensure that you label your bins with your address.
Restoration: The construction work area will be restored with sod and/or asphalt where required. Interlocking bricks, flagstone on a granular base, or other similar features that are removed from public and private property during construction will be replaced. Lawn seeding and/or laying of sod will be done as needed during ideal growing seasons only - in the spring (April to June) and fall (September to October).

NEED MORE INFORMATION?

If you have questions about the upcoming work, please contact us and quote Contract #17ECS-TI-13LR.

Field Ambassador 

Margaret Suen, 416-497-8600 ext 1367, Toronto13LR@rvanderson.com

TTY Hearing Impaired Service

416-338-0889

(7 Days a week, 8:00 am – 5:00 pm, closed holidays)

General inquiries

311

Website

toronto.ca/improvements/ward27.htm

 

Thank you for your patience.  Building a great city takes time. Better infrastructure for all of us is worth the wait.